Main Engine Maintenance & Repair
Professional mechanical servicing in Tuzla shipyards, anchorages, and voyage repair to keep main propulsion engines operating at peak reliability. Every stage from initial diagnostic to sea trials is thoroughly documented to class society standards.

Scope
- Piston pulling, cleaning, ring groove calibration and honing
- Cylinder head overhaul, valve seat grinding and pressure testing
- Cylinder liner wear measurement and plateau honing
- Main and bottom end bearing inspection and clearance checks
- Crankshaft deflection measurement and optical alignment
- Fuel pump, delivery valve, and injector calibration
How the job runs
- 1
Initial Inspection & Readings
Recording running hours, deflections, and initial operating clearances.
- 2
Controlled Dismantling
Hydraulic torque tool removal following manufacturer maintenance schedules.
- 3
Precision Machining & Reconditioning
Micrometer gauge audits, seat cutting, bearing renewal, and honing.
- 4
Assembly & Tightening
Torque sequence execution and post-assembly clearance logging.
- 5
Sea Trials & Reporting
Verification under load, thermal readings, and written report.
Equipment we work onRepresentative
- 2-Stroke Crosshead Engines (MAN B&W, WinGD, Sulzer)
- 4-Stroke Medium Speed Engines (Wärtsilä, Yanmar, Daihatsu, MaK, Caterpillar, Bergen)
This list is representative. Send us your engine model and we will confirm the scope. Not an OEM authorisation.
Work in this service
Related guide articles
Questions
How often should crankshaft deflection be measured?
According to class rules and maker manuals, readings should be taken every 6 months and before/after dry-docking in both hot and cold conditions.
How long does single unit piston pulling take on-board?
Subject to crane availability and prep work, dismantling, gauging, ring replacement, and reassembly typically takes 6 to 10 hours per cylinder.
Quote for this job
Tell us where the ship is and what failed; we'll review the scope and get back to you.